Research on Switching Overvoltage Caused by Faults in 1000kV UHV AC Transmission Line

XU Wei,CHEN Shui-ming,HE Jin-liang
DOI: https://doi.org/10.3321/j.issn:1000-3673.2005.21.003
2005-01-01
Abstract:On the basis of briefly describing the fault caused switching overvoltage in power transmission line whose operating voltage is 1000kV, the fault caused switching overvoltages under various operating conditions of single circuit UHV power transmission project from Jincheng to Jingzhou via Nanyang, which is planed and constructed by State Grid Corp. of China and whose operating voltage is 1000kV, are researched. The switching overvoltages involve the overvoltage caused by single- or multi-phase earth faults and that caused by clearing the faults. The measures to eliminate the overvoltage level are put forward, they are: installing ZnO arrestors along the line, using controllable parallel reactor and installing resistors in parallel with circuit breakers, etc. Simulation results show that the higher the compensating capacity is, the lower the overvoltage level caused by faults will be. If the ZnO arrestors are only installed at the both ends of the line, the overvoltage caused by single phase auto-reclosing can be decreased to a certain extent, but the overvoltage level is still rather high, so further measures should be taken. When parallel switching-on resistance and ZnO arrestors are simultaneously used, the fault caused overvoltage level can be evidently eliminated.
What problem does this paper attempt to address?