Analysis on Overvoltage in Renovated Control and Protection System for HVDC Power Transmission Project from Tianshengqiao to Guangzhou

Hao Zhou
2011-01-01
Abstract:System overvoltages in the renovated ±500 kV DC power transmission project from Tianshengqiao to Guangzhou under four typical fault conditions,i.e.,single-phase grounding occurred at upper-half rectifier bridge side of wye-wye connected winding of converter transformer,interphase switching surge from AC system,loss of AC power supply occurred at inverter side and inverter being blocked with unblocked bypass pairs,are analyzed and computed to ensure overvoltage at different positions in the grid as well as energy consumption of arresters can be restricted within rational ranges by renovated control and protection system,thus the secure operation of all power equipments can be implemented.Analysis results show that higher overvoltages will appear at neutral-bus due to single-phase grounding occurred at valve side of wye-wye connected winding of converter transformer,and the energy consumption of neutral-bus arrester will also be higher;higher overvoltage will appear at the terminals of rectifier valves due to interphase switching surge from AC system and it makes valve arrester operated;higher overvoltage will occur at AC bus of inverter station due to the loss of AC power supply at inverter side and it makes AC bus arrester operated;a rather high overvoltage will appear on DC polar line at inverter side due to inverter being blocked with unblocked bypass pairs and it makes a high energy consumption of arrester of DC polar line.The energy consumption of all arresters does not yet exceed the designed discharging capability under these four fault conditions,thus secure and stable operation of all arresters can be ensured.
What problem does this paper attempt to address?