Overvoltage Mechanism of Converter Valves for HVDC Power Transmission Project from Tianshengqiao to Guangzhou

陈锡磊,周浩,袁士超,王东举,田杰,黄志岭,卢宇
DOI: https://doi.org/10.13335/j.1000-3673.pst.2012.03.022
2012-01-01
Abstract:Based on the HVDC power transmission project from Tianshengqiao to Guangzhou the mechanism leading to converter valve overvotage is analyzed and analysis results show that overvoltage will appear at both terminals of the valves under two conditions: the first one is that after turning-off all valves in uppermost layer of commutating group overvoltages appear at both terminals of the valves belonging to this layer, whereas when all valves belonging to other layers of commutating groups are turned-off there in general will not be overvotlages appearing at both terminals of these valves; the second one is that the switching surge due to interphase operation in AC-system will lead to higher overvoltage appearing at both terminals of valves. According to the analysis results, simulation analysis on two typical faults, namely the single-phase short-circuit occurred at upper-half rectifier bridge side of wye-wye connected winding of converter transformer and switching surge caused by interphase operation in AC-system, is performed. Simulation results show that when HVDC system is operated in minimum power transmission mode, the single-phase short-circuit fault occurred at upper-half rectifier bridge side of wye-wye connected winding of converter transformer will lead to higher overvotage at both terminals of valves while the energy passing through valve arrester reaches its maximum value, however, along with the increase of transmitted power the energy passing through valve arrester will decrease; in view of the fact that the transformation ratio of converter transformer configured in rectifier station is higher than that in inverter station, the swithching surge caused by interphase operations in AC system, which possess the same amplitude, will lead to relatively serious overvotlage appearing at both terminals ot converter valves in rectifier station.
What problem does this paper attempt to address?