Research on key issues of insulation coordination for ±1 100 kV UHVDC converter station
Xilei Chen,Hao Zhou,Dongju Wang,Ke Sun
DOI: https://doi.org/10.3969/j.issn.1003-6520.2013.12.025
2013-01-01
Abstract:Insulation coordination of converter station is one of the key technologies in the implementation of ±1 100 kV UHVDC power transmission projects, which normally guides the design, type selection, manufacturing and testing of converter station equipment. To specify insulation levels of ±1 100 kV converter station equipment reasonably, to lower technological difficulty of a project, and to improve its economy, we studied two key issues, namely, the configuration scheme and type selection of arresters in converter station, on the basis of the ±1100 kV UHVDC power transmission project from Zhundong to Chengdu. Thereby, the arrester configuration scheme for ±1 100 kV UHVDC converter station is recommended to be basically the same as the arrester configuration scheme for ±800 kV converter stations, except it has A2 arrester installed at the upper valve side of converter transformer. This arrester configuration scheme can reduce the insulation levels of bushings of upper converter transformer and the insulation level of 1 100 kV UHVDC wall bushing from 2 250 kV to 2 100 kV and 2 150 kV respectively; and the two insulation levels can be further reduced to 2 000 kV if 1 000 kV UHVAC high-performance MOAs are adopted.