Research on working condition of key components for fixed series compensation in 1000 kV UHVAC power transmission project

Yuanyuan Zhang,Liangeng Ban,Zutao Xiang,Jiming Lin,Bin Zheng,Yanping Zhang,Bin Han,Yanan Han
2013-01-01
Abstract:Based on the extension project of 1000 kV AC power transmission demonstration project from Changzhi via Nanyang to Jingmen and utilizing electromagnetic transients program (EMTP) the working conditions of key components for fixed series compensation in 1000 kV UHVAC power transmission under internal faults, namely the faults occurred between the circuit breakers at both sides of the line where the series compensation locates, and the external fault, namely all faults except internal faults, are researched. It is first proposed to use the combination of metal oxide varistor (MOV) with parallel gap as the overvoltage protection measure for UHVAC fixed series compensation: during the external fault the overvoltage is only suppressed by MOV while the parallel gap does not act; during the internal fault the spark gap and by-pass switch act, thus the capacitor and MOV are bypassed. The overvoltage protection level for UHVAC series compensation is 2.3 pu; the maximum energy dissipation level of the MOV for the series compensation of No. 1 transmission line from Changzhi to Nanyang and that for the series compensation of No. 1 transmission line from Nanyang to Jingmen are 57 MJ per phase and 45 MJ per phase respectively; the damping circuit composed of reactor and MOV with resistance connected in series is used as the discharging damper for the series compensation capacitor and the natural vibration frequency of capacitor discharging circuit is about 300 Hz; during short-circuit fault the maximum discharging current of spark gap for UHVAC series compensation and bypass switch is 153 kA.
What problem does this paper attempt to address?