Structural Design of Zhangjiang Lidu Cable-stayed Bridge in Chongqing

Qiang Zhang
2007-01-01
Abstract:Chongqing Lidu Changjiang Bridge is located in Lidu town, 6.5km from the downstream Fuling Bridge under construction. Its main bridge is concrete cable stayed span of 398m with double towers. The bridge is arranged symmetrically, i.e. 170m+398m+170m=738m. The width of the bridge is 25.1m. The main tower is H shaped. The main beam is of prestressed concrete structure. This paper presents in details the structural design.
What problem does this paper attempt to address?