Design and Construction of Cofferdam for Non-Navigable Span Approach Bridge of Pingtan Straits Rail-cum-Road Bridge

WANG Dong-hui
2016-01-01
Abstract:The non‐navigable span approach bridge of the Pingtan Straits Rail‐cum‐Road Bridge over the shallow water area (the water depth being less than 15 m) is a 48‐m span prestressed con‐crete girder bridge .The foundations for the bridge are the bored piles that were constructed ,using the cofferdams .A cofferdam for the construction of the piles is the steel boxed cofferdam structure that has the plan dimensions of 14 .8 × 23 m and the height of 12 .3 m and in the cofferdam ,two tiers of the internal supports were arranged .Through the calculation of the load cases of anti‐buo‐ying of the cofferdam by pumping out the water and anti‐sinking of the cofferdam after casting the concrete for the pile cap under the condition of base sealing of the cofferdam ,it was determined that the depth of the base sealing concrete for the cofferdam should be 2 m .With reference to the sea condition characteristic of the Pingtan Straits and in thorough consideration of the wave force action and the great tidal difference influence ,the cofferdam was integrally assembled and was in‐tegrally lowered to its designed elevation ,using the jacks after the bored piles were constructed .In the cofferdam ,3 tiers of the guiding and limiting devices were also arranged in order to ensure the safety of the cofferdam at the time the cofferdam was being lowered into the water .After the base for the cofferdam was sealed and the water in the cofferdam was pumped out ,the slinging system of the cofferdam was installed for the second time ,the hangers and slinging corbels were installed again in order to accommodate the construction of the pile cap .The side plates and bottom plate of the cofferdam were connected by pins and the diagonal struts were welded to fix the side plates and bottom plate in order to resist the vibration caused by the wave forces .
What problem does this paper attempt to address?