Control Technique for Accurate Landing of Caisson of Pier No.3 of Tongling Changjiang River Bridge on Hefei-Fuzhou Railway Onto Riverbed
QIN Yong-gang,TU Man-ming,WANG Dong-hui
2013-01-01
Abstract:The main bridge of Tongling Changjiang River Bridge on Hefei-Fuzhou Railway is a steel truss girder cable-stayed bridge with three cable planes and with a main span 630 m.The Pier No.3 of the north pylon of the bridge is supported on the foundation of round-ended caisson that was constructed by the scheme of two-time positioning and quick landing of the caisson onto the riverbed by water pumping.To make sure that the caisson could be accurately landed onto the riverbed,the spatial model for the caisson and its tie anchor rope system was set up by the finite element software MIDAS 2006,the process of the landing of the caisson was simulated,the changing laws of the caisson offsetting and anchor rope forces in the process of the landing were analyzed and it was determined that the distance between the bottom of the caisson and the riverbed should be kept 2 m at the time the caisson was being positioned.To minimize the influences of the scouring,soil non-uniformity of the riverbed,waves and vortex vibration on the accurate landing of the caisson onto the riverbed,the measures of pumping water into the caisson for quick landing of the caisson,rectifying the offsetting of the caisson by winching the anchors,increasing the numbers and rigidity of the side anchors of the caisson and increasing the mass and damping of the caisson itself were respectively taken.
What problem does this paper attempt to address?