Simulation of cantilever-casting construction of prestressed concrete cable-stayed bridge

Wang Jinfeng,Xiang Yiqiang,Xu Xing
DOI: https://doi.org/10.3321/j.issn:1671-4512.2008.04.031
2008-01-01
Abstract:According to structure feature of modern prestressed concrete(P.C.) cable-stayed bridge and its stress characteristics,degenerated solid element was adopted to build 3D models of cantilever casting analysis for P.C.cable-stayed bridge.The prestressed reinforcement was taken as a part of structure,and the prestressing effect was simulated by equivalent node loads.The concrete creep effect was computed by a three-parameter viscoelastic model. The formula to calculate the action of concrete casting was deduced on the basis of the deformation compatibility condition of trailing cable′s anchorage.One P.C.cable-stayed bridge as an example was studied in application.The results show that the method is better than the classic two-dimensional method.It can give a correct prediction of cable tensions,and provide a sound basis for construction control and checking.
What problem does this paper attempt to address?