Cantilever-casting Control of Prestressed Concrete Cable-Stayed Bridge

WANG Jin-feng,XIANG Yi-qiang,XU Xing
DOI: https://doi.org/10.3785/j.issn.1008-973x.2005.09.020
2005-01-01
Abstract:Aiming at with the complex change process of the girder's stress and line shape during cantilever casting, methods for controlling the trailing cable tension and the traveller's front level were proposed. After introducing the technique for cantilever casting of prestressed concrete(PC) cable-stayed bridge, a formula for computing the increment of cable tension during concrete casting was decuced based on the deformation compatibility condition of the trailing cable's anchorage, and the mathematical expression of traveller's front level was derived. The method for bi-control of the cable tension and the line shape during the cantilever casting was obtained, and then was applied to control the Wenhui Bridge's cantilever casting. Results show that the error of traveller's front level is within 1.0 cm, and that the errors of most of the trailing cable tensions is within 40 kN. The proposed method can control the cantilever casting process, and the errors of cable tension and girder's level can be reduced to an acceptable scope.
What problem does this paper attempt to address?