Calculation of stayed-buckle cable forces for concrete-filled steel tubular arch bridge with long span in process of lifting

张治成,叶贵如,陈衡治
DOI: https://doi.org/10.3785/j.issn.1008-973X.2004.05.019
2004-01-01
Abstract:The method of FEM analysis combined with optimization was used to calculate inversely the cable forces. The calculation aimed at minimizing the square sum of the altitude deviation of all altitude-controlled nodes. It was limited by the internal force of the arch and the allowable odds of the altitude-controlled nodes. The first order optimization method was introduced to acquire the cable forces. Based on the function of ANSYS on structure analysis and optimization, the method was implemented to calculate the cable forces in the process of segment suspending construction of a concrete-filled steel tubular (CFST) arch bridge. The results showed that this method is precise and effective for bridge construction.