Research on monitoring and control for suspender cable tension of half-through concrete filled steel tube arch bridge

Fuli Zhao,Yiqiang Xiang,Qiangqiang Wu
DOI: https://doi.org/10.4028/www.scientific.net/AMR.859.131
2014-01-01
Abstract:The measurement accuracy of the cable tensions in the hanger rods of concrete filled steel tube arch bridges is important for the correct evaluation of bridges condition. Based on Jinpan Bridge-a half through concrete filled steel tube arch bridge with 80 m span in Tiantai, it was put forward the vibration frequency method for testing and evaluate suspender tensions with the help of analysis vibration characters of the suspender. The precision of cable force calculation formula was verified after comparing the practical tension with the designed tension obtained from tension jack method. Then, according to the test results and values predicted by the presented cable force calculation formula, the cable tensions were adjusted. Cable tension test results in the finished bridge show that this method is feasible.
What problem does this paper attempt to address?