Analysis and Monitor of Hanger Rod Installation by Jacking Tie Beam on Heterotypical Arch Bridge

SHEN Yong-gang,XIANG Yi-qiang,YAN Sheng-you
DOI: https://doi.org/10.3969/j.issn.1004-4655.2007.06.008
2007-01-01
Abstract:For the features of force on the full steel heterotypical arch bridge,an easy and appropriate method is proposed for installation of the hanger rod by jacking the tie beam.With calculation and analysis and comparison of results from site monitoring of a bridge for plowing tractors,it is found that the method can easily obtain adequate initial tension and has the main girder reach the design alignment.After completion of the bridge,hanger rod near the jacking spot is in the cable force much greater than other hanger rods and bears the main dead and live loads of the full bridge.
What problem does this paper attempt to address?