The Analysis of the Bearing Capacity of Hoisting Stand Used in Long-Span Steel Truss Arched Bridge

Yuan-qing WANG,Bo JIANG,Yong ZHANG,Yong-jiu SHI,Jie QIN,SHENG-lie Pan
DOI: https://doi.org/10.3321/j.issn:1671-2021.2006.01.008
2006-01-01
Abstract:In the construction of arch bridge, the ribs are often hoisted in whole or in several segments. It is very important to analyze the bearing capacity of hoisting supports where ribs of arch bridge are lifted by jacks fixed on supports. Supports are the main bearing structure during the hoisting process. This study analyzes the bearing capacity of steel hoisting supports and towers in a practical example-Guangzhou Xinguang Bridge. The bridge is located in Guangzhou, Guangdong Province, and is designed as a 3-span continuous steel truss arched bridge. It has a total length of 1083.20 m, and a main span of 428 m. Ribs braced on six supports and two towers are divided into five segments to be hoisted. We examined the structure of flexible hoisting supports and towers and construction procedure of this bridge, followed by strength and stability analysis of flexible hoisting brackets with both linear and nonlinear method. Results showed that stress derived from the nonlinear method is very close to the result from linear analysis, but the ultimate nonlinear buckling load is much smaller. Additionally, the influence of initial defects on the ultimate nonlinear buckling load was considered in the buckling analysis, and it showed little effect on the ultimate load.
What problem does this paper attempt to address?