Cable Force Monitoring in Arch Bridge Suspender Replacing

SHEN Bai-zhong,ZHOU Xue-feng,ZHAO Ming-chao,WANG Yin-hui
DOI: https://doi.org/10.16503/j.cnki.2095-9931.2013.24.008
2013-01-01
Abstract:Suspender cable force monitoring should be carried on in the entire replacing process of arch bridge suspender. Vibration method is not applicable to the short suspender. This paper proposes the method and content for cable force monitoring during the suspender replacing, and puts forward a new method of vibration for monitoring. Engineering example proves that the method is simple, effective and practical.
What problem does this paper attempt to address?