Integral Lifting Construction and Monitoring of Qifeng Bridge in Huzhou City

ZHAO Yang,XIANG Yi-qiang
2008-01-01
Abstract:To fulfill the navigation development plan of the Hu-Jia-Shen Channel,which is located in the eastern coast of China,it is necessary to upgrade its width and clearance height.Qifeng Bridge,an arch bridge over the channel,is required to be raised by 2.5 m using integral lifting methods.In this paper,the operation principles of the hydraulic jack system,the composition of the supporting structures as well as the lifting process of the bridge are introduced.For safety purposes,a 3D finite element method(FEM) model of the bridge and supporting system is established to analyze the characteristics of contact and stress distribution.The stress of superstructure and supporting structures are also monitored.
What problem does this paper attempt to address?