Design and Construction of 4200 kN Cable Crane for Caiyuanba Changjiang River Bridge

LI Jun-tang,YAO Fa-hai,WANG Dong-hui
2006-01-01
Abstract:The main bridge of Caiyuanba Changjiang River Bridge in Chongqing is designed as a hybrid arch bridge composed of rigid-frame structure,basket handle steel box tied arch and steel truss girder.In the construction,the superstructure blocks of the main bridge are lifted and erected with the 4 200 kN cable crane.In this paper,the determination of the basic parameters of the crane and design of each part of the crane components based on the load calculations are described.
What problem does this paper attempt to address?