Installation Design for Zhijinghe Steel Tube Arch Rib Bridge

Chang-hua ZHOU,Yong ZHOU,Huan LIU,De-bing LI,Tian-guo TANG
DOI: https://doi.org/10.3963/j.issn.1674-6066.2007.05.048
2007-01-01
Abstract:The Zhijinghe bridge run across the Zhijinghe River,and because the two sides are steep,the construction site is narrow,there is difficult transportation situation for construction.So the the installation design of the bridge is necessary and important.In this paper,the construction situatin is analyzed,the installation project design is conducted for cable elevator,anchor spindle system,cable system,combined cable saddle,operating and lifteing system,the arch rib installation process,cable-stayed system,arch closure and cable uninstallation in detail.
What problem does this paper attempt to address?