Experimental Study on the Load Bearing Capacity of a New Style Joint Between the Cable and Concrete Filled Tubular Arch Bridge

Wang Yuan-qing
2006-01-01
Abstract:The design of the joints between cable and arch rib is a difficult,but key technological problem in the construction of tied arch bridge.A new style joint called riding type joint can avoid the problems existing in traditional joint styles in the course of construction and maintenance.It was used in Ganjiang river bridge in Ji’an city of Jiangxi province for the first time.In order to make clear the load bearing performance of this kind of joint,a full scale model test was carried out on the bridge site based on theoretical analysis.This paper introduces the the test in detail,including the background of the test,the design of the specimen and loading scheme,etc.The stress and deformation of the test specimen are measured.The test results show that the distribution of stress around the cable support is quite even,and the local deformation of the joint is very small,which makes sure that this joint can meet the requirement of the load bearing capacity and rigidity of the bridge.The manufacture of the specimen also illustrates the constitution of the joint is quite simple and is easy to construct.This joint is worth recommending.
What problem does this paper attempt to address?