Selection of Protection Measure for Very Fast Transient Overvoltage of 500 Kv GIS

胡文堂,金祖山,李思南,周浩,沈维君
DOI: https://doi.org/10.3969/j.issn.1003-6520.2005.01.014
2005-01-01
Abstract:With EMTPE program, very fast transient overvoltages c aused by disconnecting switch operation of 500 kV GIS are simulated and calculat ed in this paper. The effect of protection measures on HV side of main transform er is compared and analyzed, such as: 1)adding parallel coupling capacitor, 2)se ries connecting to the wave trap coil or, 3)combining the two methods. The first method is better to reduce voltage oscillation amplitude, to filtrate high freq uencies and to decrease wave front gradient.
What problem does this paper attempt to address?