Analysis on Electromagnetic Compatibility Immunity Requirements for Transfomers During Switching Transient Operations in UHV GIS Substation

Zihan Teng,Kai Zhou,Yao Yao,Jun Zhao,Jiangong Zhang,Zhongzhi Cao
DOI: https://doi.org/10.1109/ICPEE60001.2023.10453900
2023-01-01
Abstract:In the intelligent upgrade of gas insulated switchgear (GIS) substations, the intelligent secondary equipment connected to current transformer (CT) or potential transformer (PT) are required to be placed in the GIS field, which is susceptible to transient electromagnetic interference generated by disconnector operation. To ensure the reliable operation of the secondary system, it is necessary to establish electromagnetic compatibility assessment requirements that meet the actual engineering conditions. This research focuses on the transient disturbance of the secondary ports of PT and CT used in ultra-high voltage (UHV, 1000kV) GIS substation. By constructing a full-scale 1000 kV GIS circuit with the ability to conduct large-scale disconnector operations and developing an electromagnetic disturbance measurement system, an UHV level test was conducted and the statistical characteristics of the disturbance voltage and disturbance current at the secondary port of PT and CT were obtained. The test results indicate that the disturbance current amplitude at the secondary port of CT has a 99.7% probability of not exceeding 25.04A, and the disturbance voltage amplitude has a 99.7 <sup xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">%</sup> probability of not exceeding 6.97kV. It is recommended to upgrade the test level from level 3 (2kV) to level X (7kV) when conducting fast-damping oscillation wave tests according to the IEC 61000-4-18.
What problem does this paper attempt to address?