Study on VFTO of AC Ultra-high Voltage GIS Substation

WAN Yi-ru,CHEN Guang,CHEN Jia-miao,SHEN Yang,DING Jian,ZHOU Hao
2010-01-01
Abstract:The very fast transient overvoltage(VFTO) of the ultra-high voltage GIS system may pose the threats to the GIS main insulation and the main transformer.The southeastern Shanxi ultra-high GIS substation prospective time model of the connection mode of a 3/2 circuit breaker was built with the EMTP simulation software.The possible maximum VFTO produced by switching the main transformer,outgoing line and bus line was calculated.The possible maximum VFTO produced by switching the main transformer was estimated to reach 2.51 p.u.,which will cause severe damages to the main insulation and interturn insulation of the GIS.However,the VFTO produced by transferring outgoing line and bus line will not cause any damage.The measures of following the normal operating sequences and completely eliminating the VFTO produced by transferring the main bus for the 3/2 circuit breaker were indicated.For the ultra-high voltage substation,the disconnector should be separated after separating the high and low circuit breakers in the two sides of the main transformer.For the large-scale power plant,it was suggested to install the generator circuit breaker(GCB) and separate the GCB and the circuit breaker in the high-voltage side of the main transformer followed by separating the disconnector.By these measures,the VFTO produced by operating the main transformers in ultra-high voltage substation and large-scale power plant can be eliminated completely,ensuring the safety of the main insulation of the GIS ontology and the interturn insulation of the main transformer.
What problem does this paper attempt to address?