Features of main protection configuration for hydro-generator with two branches per phase

Lin GUI,Weijian WANG,Yuguang SUN,Xiangheng WANG
DOI: https://doi.org/10.3969/j.issn.1006-6047.2008.12.001
2008-01-01
Abstract:Five schemes of main protection configuration for hydro-generators with two branches per phase are presented to show that, the scheme of "transverse one plus longitudinal one" (split-phase transverse differential protection plus incomplete longitudinal differential protection) obtained by quantitative design is completely different from traditional one (zero-sequence current transverse differential protection plus complete longitudinal differential protection). In order to meet the requirement of integrated optimization of main protection design and electric machine design, other schemes should be set according to the protective performance of quantitative design and the allocation of neutral point current transformer. This project is supported by the National Natural Science Foundation of China (50707014) and the Youth Innovation Foundation of the Department of Electrical Engineering, Tsinghua University.
What problem does this paper attempt to address?