Analysis and Treatment for High Voltage Bushings of Electric Auxiliary Boiler of Nuclear Power Plant

Z. Jian
Abstract:The structure and theory of the two high pressure discharged steam electrode boilers installed in QINSHAN Nuclear Power Plant II is presented,and the causes for the High Voltage Bushings malfunctions since the boiler put into operation are also analyzed in this paper.The suggestions for the improvement of replacement and maintenance of the Bushings are given.
Environmental Science,Physics,Engineering