Operational Analysis on 500kv Three Gorges Overhead Power Transmission Line

Youwei Du
2008-01-01
Abstract:Keeping the safety of 500 kV Three Gorges power line,the major electric energy transmission passage,is of great significance to the Three Gorges regional network,as to the nationwide grid too.To reduce the fault tripping rate and to ensure running safety and stability of Three Gorges power line,some precautionary methods were put forward to prevent fault tripping by such as lightning strike,dirty flash,ice covering,wind drifting,etc,on the basis of a statistical analysis to the 500 kV Three Gorges power line's operational data running by Hubei EHV Transmission and Substation Company since 2001,which established the basis for improving power line availability factor,and enhancing running safety and stability of electricity grid.
What problem does this paper attempt to address?