High-level Integral Rolling-crossing-shifting Installation Technology for a Steel Structure Gallery

Chen Ai
2002-01-01
Abstract:In the construction of the large span steel structure gallery of the Sight\|viewing Hall of Shenzhen Chuangwei Digital Research Center, engineers installed roller\|wheel equipment under the steel gallery, which weighs 360t, and shifted it integrally with the hauling power of lifting machines. It was suspended from the top of a tower building and crossed 47m to be connected with the other tower building.