Deployable Integral Lifting Construction Technology for Cylindrical Latticed Shells

Yao-zhi LUO,Ning HU,Yan-bin SHEN,Shi-lin DONG
DOI: https://doi.org/10.3969/j.issn.1671-9379.2005.04.006
2005-01-01
Abstract:A new installation method named deployable integral lifting construction technology (DILCT) was proposed for the erection of the cylindrical latticed shell in this paper. The basic concept of the DILCT is the core mechanism. The principle of deployable integral lifting construction technology for cylindrical latticed shells is to take out a part of members of the shell, so that a statically determinate structure becomes a foldable one, and the structure is assembled in a folded shape near the ground. Then the folded structure is lifted to its final shape. At last the members that have been temporarily taken out are installed, and the mechanism becomes a statically determinate structure. The DILCT can save a great deal of scaffoldings, labor and time for the installation of the large span latticed shells and has a obvious benefit in economy and society. The DILCT was proposed by Zhejiang University and firstly applied for the erection of the 108m span cylindrical latticed shell of the coal storage in Yahekou Power Plant. In this paper, the basic concept,the construction technology,configuration of connections,the structure characteristic in lifting,the technique measurements and the construction controlling are discussed.
What problem does this paper attempt to address?