Structural analysis and climbing mechanism test of integrated intelligent tower building machine for Lingdingyang Bridge on Shenzhong-Zhongshan Link

yan Su
DOI: https://doi.org/10.1117/12.2689426
2023-09-07
Abstract:In view of the current situation of super-high concrete bridge tower construction, facing the huge demand of high efficiency and high quality construction and labor intensive production, combined with the cable tower construction of Lingdingyang bridge on Shenzhong-Zhongshan link and modern factory manufacturing, the concept of "vertical factory" for bridge tower construction is put forward. The finite element static strength analysis of the tower building machine structure is carried out, and the mechanical performance of the climbing system and the bearing capacity of the corresponding anchorage system are verified through the test, so as to provide data support for the use of the tower building machine.
Engineering
What problem does this paper attempt to address?