Requirements of Arresters for Deeply Suppressing Switching Overvoltage in AC UHV Systems

Jinbo WU,Jun HU,Pengfei MENG,Jinliang HE
DOI: https://doi.org/10.13336/j.1003-6520.hve.20171127042
2017-01-01
Abstract:To suppress the operating overvoltage deeply,using 1 000 kV UHV project from Huainan to Wannan as an example,we calculated the switching transient to estimate effects of suppressing the overvoltage for measurements such as setting arresters on both ends,cooperation between arresters and closing resistance,setting an arrester in the middle of the line and setting several arresters along the line.Moreover,we discussed the requirements for arresters in residual voltage,charge rate,the withstand capacity of power frequency overvoltage,and energy absorption capacity.After using LRA with 1.4 times of rated voltage,the operating overvoltage level can be reduced to 1.3~1.4 times of per-unit value when using LRA with 1.3 times of rated voltage,the value can be 1.2~1.3.