Safety Analysis on the Water Wall in the 350 MW Supercritical CFB Boiler under Sudden Electricity Failure

Boyu Deng,Man Zhang,Junfu Lyu,Shaohua Li,Hairui Yang
DOI: https://doi.org/10.1016/j.energy.2019.116364
IF: 9
2019-01-01
Energy
Abstract:The necessity of setting up the emergency water supply system in the supercritical circulating fluidized bed (CFB) boiler is still in controversy in the industry. Based on the research methods in the previous literature and the operating experience, this paper proposed three possible emergency strategies for sudden electricity failure. And by analyzing the physical process in the furnace under sudden electricity failure condition, a mathematical model consisted of the mass and energy conservation equation was built, and the accuracy of this model was validated by the experiment data from a supercritical CO2 experimental system. With the help of the model, this paper can quantitatively predict the dynamic process of the working fluid concerning temperature, pressure, and mass in the water wall in the 350 MW supercritical CFB boiler under the above three emergency strategies. In addition, an estimation of the pipe-broken time for the water wall under such condition was given. Results showed that the longest pipe-broken time was about 52 mins considering the pressure effect. Thus this paper can draw a preliminary conclusion that setting up an emergency water supply system was not a necessity in the 350 MW supercritical CFB boiler. (C) 2019 Elsevier Ltd. All rights reserved.
What problem does this paper attempt to address?