Fault Analysis and Treatment of Partial Discharge in 500 kV Transformer

PENG Fei,CHENG Lin,FANG Tiyou,WU Yihua,ZHAN Hao
DOI: https://doi.org/10.13296/j.1001-1609.hva.2015.12.033
2015-01-01
Abstract:Partial discharge of a 500 kV power transformer seriously exceed under 680 kV in routine ACSD test. After the accident, phased oil sampling analysis is taken to the transformer, the diagnostic tests are carried out after check wiring and test equipment. The oil sample test and analysis results indicated the fault of transformer is internal fault. Subsequently , the high-voltage head hanging core examination reveals the outermost insulation and regulated lead insulation wood screws and other parts have traces of discharge. Through the discharge site and the surrounding electric field simulation analysis , clear the discharge path, combined with experimental phenomena, determines that the failure is caused by a design flaw of the transformer and low dielectric strength of the insulation member caused. The corresponding maintenance treatment program is proposed. The accident analysis and processing programs can provide proposals for improving the follow-up of power transformer design and production process.
What problem does this paper attempt to address?