Retrofit of 130t/h PC-Boiler

赵慧武,张久大,丁国旺,胡海滨,李伟,邹铭,吴疆,高丽芳,刘渊,叶进武
DOI: https://doi.org/10.3969/j.issn.1002-6339.2002.06.007
2002-01-01
Abstract:By analysis of problem of 130t/h PC-boiler,reasonable retrofit plan was put forward,and satisfying result was obtained.
What problem does this paper attempt to address?