Study on Flow Path Retrofit Scheme and Application of 300 MW Steam Turbine
Junhong WANG,Zhigao LI,Houzhang TAN
DOI: https://doi.org/10.3969/j.issn.2095-0802.2019.04.036
2019-01-01
Abstract:Safety problems like the high running heat consumption and the high coal consumption occurred in the domestic 300 MW steam turbine after it was transformed into heating extraction unit, and the partial structural problems, pressure loss, inlet and steam leakage losses appeared in domestically introduced 300 MW steam turbines after transformation. Therefore, this paper proposed flow path retrofit scheme for the two units respectively to optimize the design of all high, medium and low pressure cylinders of steam turbines while minimizing changes in existing equipment. After the transformation, the efficiency of the steam turbine high pressure cylinder is expected to reach 86%, the medium pressure cylinder reaches 93%, and the low pressure cylinder reaches 88%; under the THA working condition (heat rate acceptance condition), the unit heat consumption rate is reduced by about 796 kJ/(kW·h), reaching 8 000 kJ/(kW·h); the coal consumption for power generation can be reduced by about 29.8 g/(kW·h) (boiler efficiency is 92%, and pipeline efficiency is 99%), which can save about 4.48×104 t of standard coal per year (an annual power generation of 1.5×109 kW·h). The transformation plan is of obvious effects, good economic benefits and low risks.