Retrofitting Technique of 65t/h Pulverized Coal-fired Boiler and Its Operation Performances

王玉召,刘青,张建胜,杨海瑞,苏俊,佘简文
DOI: https://doi.org/10.3969/j.issn.1005-006x.2005.03.004
2005-01-01
Abstract:Retrofitted to circulating fluidized boiler (CFBB) is one solution of small scale pulverized coal fired boilers in power plant. How to settle the boiler layout is one of critical techniques in retrofit. Keeping the original boiler room and using the original steel frame, one 65t/h pulverized coal fired boiler was retrofitted to water cooled square cyclone circulating fluidized boiler (CFBB). The structure of the retrofitted boiler is compact and its layout is “п” shape. The operation experiences indicated that the load of the retrofitted boiler increases to 70t/h, the steam parameters can reach expected values. The material circulating system operated well, the bed temperature was reasonable, the seal of the boiler was excellent, there was no erosion on heating surface and the combustion efficiency was a bit increased.