Study and Actualization of Burning Bituminous Coal in Lean Coal-fired Boiler of the 300 MW Unit

沈跃良,陈如森,李季梅,何荣强,陈刚
DOI: https://doi.org/10.3969/j.issn.1674-0629.2009.z1.013
2009-01-01
Abstract:As the coal market changing, it is more and more popular for boiler to burn off-design coal, and how to combust bituminous coal safely and economically in the lean coal-fired boiler of 300 MW unit at the condition of not reconstructing the burning system and boiler body is worthy of study.This paper provides feasibility analysis in theory and test study in laboratory and power station on burning bituminous coal in lean coal-fired boiler of 300 MW unit with multi-function boat type burner and hot air feed pulverized coal system, resulting in a conclusion that only by setting a cold primary air bypass duct and adjusting combustion it is realized to combust bituminous coal of middle percentage volatile and slight coking property safely in the lean coal-fired boiler of 300 MW unit and more effectively than original lean coal or blended coal.The method has advantages of investing money less and yielding benefits quickly, and obvious effects of saving energy and reducing emission.
What problem does this paper attempt to address?