On analysis of case for mass concrete in winter construction

DING Da-yong,CHEN He-fu,YANG Xin
DOI: https://doi.org/10.13719/j.cnki.cn14-1279/tu.2010.22.111
2010-01-01
Abstract:Taking the winter construction of some mass concrete as an example,the paper explores the feasible implementation scheme for the mass concrete's winter construction,indicates the adoption of the maintenance method of thermal storage for the mass concrete's winter construction is adoptable, and points out the adoption of the effective temperature supervision measures can lower the construction costs with the premise of guarantee the construction quality,based on the theoretical calculation.
What problem does this paper attempt to address?