TEMPERATURE CONTROL FOR BULKY CONCRETE CONSTRUCTION ON THE BASE PLATE OF TALL BUILDING

ZHAO Yali,CHEN Yong,YU Rui,JIAO Jian,CHEN Keqiang,LOU Wenjuan
DOI: https://doi.org/10.3969/j.issn.1000-4726.2007.01.008
2007-01-01
Abstract:To over come the high temperature caused by hyaration heat of concrete during the construction of bulky concrete,a series of construct countermeasures for temperature control are presented,which successfully reduced the temperature stress,in condition of winter construction and the part thick beyond 8m.The research on the bulky concrete internal temperature development indicates how long the internal highest temperature approaches will take.Finally,the critical maintaining period of bulky concrete is declared,after depositing bulky concrete,according to the spare distribution of temperature during different maintaining period.
What problem does this paper attempt to address?