HYDRATING TEMPERATURE OBSERVATION IN THE MODEL OF A MASSIVE CONCRETE FOUNDATION SLAB

Yao LUAN,Peiyu YAN,Yaohui YANG,Xin MA,Yuqi ZHOU,Bo LI
DOI: https://doi.org/10.3969/j.issn.1000-4726.2007.01.021
2007-01-01
Abstract:The temperature history in a mass concrete mock-up,4.5×4.5×4.5m in dimension,was investigated in order to examine the rationality of concrete proportion and effectiveness of construction measures related to the foundation of main tower in the project of the International Trade Center,Phase Three.Several sensors which monitored the temperature development instantly were disposed in different positions.The results show that the temperature rise inside the concrete was about 40℃,which was achieved between 5 and 7 days.The difference of temperatures between any points was less than 21℃.The requirements proposed in the design about the temperature field and developing regime in the foundation slab can be satisfied based on the mix design of concrete and the construction measures utilized in this experiment.
What problem does this paper attempt to address?