Crack Control of Massive Concrete Foundation Slab about Third Phase of International Trade Center

Xin MA,Yao LUAN,Pei-yu YAN,Yu-qi ZHOU,Bo LI
DOI: https://doi.org/10.3969/j.issn.1002-8498.2007.08.027
2007-01-01
Abstract:The hydration temperature rise and shrinkage of concrete were alleviated because of rationality of raw materials choice and proportion optimization in the third phase project of International Trade Center.Furthermore,the full-scale model test was carried out and showed that the concrete proportion and curing and construction methods can be applied in the massive concrete foundation slab of the main tower.Besides,in the construction of foundation slab,several management measures were executed strictly to make the concrete have a good quality.
What problem does this paper attempt to address?