Measurement and control of temperature in mass concrete construction of pile caps of Hutiaohe Bridge

YU Lu,WANG Lei,ZHU Wei-xuan
DOI: https://doi.org/10.3969/j.issn.1009-6825.2006.24.077
2006-01-01
Abstract:Combined with mass concrete works of 6-10# pier platform of Hutiaohe bridge in winter temperature measurement and control measures of mass concrete are introduced.Adding high efficiency water reducing agent,water storage curing and other measures are proposed in order to realize effective control of temperature cracks.
What problem does this paper attempt to address?