Analysis on surface protection time for concrete at early age in winter

HUANG Da-hai,YANG Hu,SU Jun-an
DOI: https://doi.org/10.3969/j.issn.1000-0860.2008.09.017
2008-01-01
Abstract:Based on the simulative analysis software-FZFX3D,two different conditions: the concrete surface is to be covered with or without curing insulation material immediately after the placement are calculated by taken a model dam,of which the concrete construction begins during winter,as the actual case.The temperature distribution,heat flux and temperature rise of the whole dam body on a specific elevation are analyzed,and then an optimal time to begin the concrete surface protection for the curing during winter is proposed herein as well.
What problem does this paper attempt to address?