Research And Application On Performance-Based Optimization Of Concrete Structure Construction

Ye Tian,Nanguo Jin,Xianyu Jin,Bingliu Wu
2012-01-01
Abstract:At the early age, the microstructure formation of concrete is very sensitive to the environmental conditions. A slight variation of temperature and humidity at early age will have significant influence on the macro properties of mature concrete. So the long-term service performance of concrete structure is highly related with the environmental conditions during construction. And at the same time, for concrete, the whole construction procedure, such as casting, form removal, and curing, can be also taken as a series of changes of environmental conditions and loads. As environmental conditions and construction procedure are all time dependent, so the construction will influence the service performance of concrete structure dynamically. Although the environmental conditions during construction can not be changed, while the construction procedure can be optimized accordingly to adapt to the varying environmental conditions to improve the service performance of concrete structure. As a result, a quantitative analysis and optimization on concrete structure construction will have extensive impact on civil engineering. In this research, a new method was proposed to design and optimize the construction procedure of concrete structure. Through a monitoring system, the early-age temperature and humidity during the construction process, inside and outside the concrete structure, were recorded. In considering the influence of construction procedure on the service performance of concrete structure, the casting, form removal, and curing were all quantified as the time-dependant environmental parameters applied on concrete structure. Based on the hydration theory of cementitous materials, the long-term service performance of concrete structure was evaluated and predicted. Then the influence of construction program on the service performance of concrete structure was analyzed utilizing this evaluation system, and fed back to optimize the construction procedure. And an engineering project was also provided to verify the application value of the method.
What problem does this paper attempt to address?