Reasons for heavy gas protection operation of 500kV transformers

HE Wen-lin,LI Hong-wen,YU Rui,DAI Zhao-xiang
DOI: https://doi.org/10.3969/j.issn.1001-9529.2006.06.024
2006-01-01
Abstract:The operation process of the heavy gas protection of a 500 kV transformer is introduced,as well as the anti-seismic strength testing for the heavy gas protection.Analysis shows that the main reason for the heavy gas protection operation is that the large closing excitation inrush current caused vibration of the transformer coil body and thus created oil flow turbulence.The closing excitation inrush current was large because the residual magnetism of the transformer was overly large.The method for field control of transformer residual magnetism is put forward.