Cable-stayed Bridge Construction Condition Optimization Applying Forward-analysis Iterative Method

CHAI Xiao-peng,WU Hong-lin
DOI: https://doi.org/10.3969/j.issn.1671-1815.2011.22.059
2011-01-01
Abstract:Based on a PC cable-stayed bridge,the key points of forward-analysis iterative method is discussed,applying to determine the proper construction condition.Such as the control parameters to make proper construction condition,the geometric non-linear influence,the separate of supports during construction process,cable force influence matrix and the convergence discussion.After taking the above factors into consideration,the finished state approached the reasonable one.The method has great practical values in cable-stayed bridge engineering are proved.