Assessment of cable tension condition based on optimum cable tension of cable-stayed bridge

WU Hua-cheng,WANG Jin-feng,XIANG Yi-qiang,WENG Sha-ling
DOI: https://doi.org/10.3785/j.issn.1008-973X.2006.10.023
2006-01-01
Abstract:A constrained optimization method for cable tensions under dead loads was applied.By constraining elevation of girder and asymmetric coefficient of cable tensions,the reasonable cable tensions under dead loads were obtained with the moment distribution taken as object,which made the absolute value of negative moment envelope diagram equal those of positive one under combined loads. A condition assessment model of cable tensions was then proposed.Based on analytic hierarchical process(AHP) and variable weight synthesizing method,the performance of cable tensions was evaluated based on a sequence of measured data with the application of correlation of slope coefficient.Results showed that the correlation between slope coefficients of the measured and standard cable tensions is relatively high.With the decrease of balance coefficient,the estimated performance is a process of degeneration.
What problem does this paper attempt to address?