Mass Concrete Construction in Changsha No.2 Telecommunication Pivotal Building

Guan Ruo
Abstract:In the construction of 3 0m thick concrete foundation base board of Changsha No.2 Long Distance Telecommunication Pivotal Building project, many technical methods were adopted to ensure the construction quality of once continuous pouring and completion of this 3.0m thick concrete base board. These methods include setting up base board sliding layer, surface anti crack reinforcement and concrete interior temperature reinforcement, choosing concrete materials and mixture ratio, decreasing concrete formwork entering temperature, and making thermal insulation and moisture keeping maintenance.