Construction Difficulties and Its Solutions for Depth Difference Between Adjacent Deep Foundation Pit

Jun Zheng
2010-01-01
Abstract:As the design modification resulted in abnormal condition that foundation pit of podium is deeper than that of main building, otherwise, construction period of podium is delayer relatively, so as to avoid the non-uniform settlement of main building for excavation reason, the major quality defects of basement were analyzed by means of research statistics on basement in similar projects. Construction control factors such as ground-water lowering of annex, water penetration around basement of main building and water supplement for soil layer of foundation were determined, and corresponding technologies such as installing precipitation wells in podium, water jetting hole in basement of main building, anti-seepage shear wall between two building and strengthening settlement monitoring for main building, the expected results were achieved by adopting these measures finally.