Numerical Analysis of Effect of Foundation Pit Excavation on Underneath Existed Shield Tunnel

Gang Wei,Lingwei Hu,Jiading Zhu
DOI: https://doi.org/10.13393/j.cnki.issn.1672-948X.2014.04.011
2014-01-01
Abstract:MIDAS/GTS finite element software has been used to establish three-dimensional models of foun-dation pit on the background of an instance of the foundation pit project in Hangzhou,the effect of deforma-tion of shield-driven tunnel by foundation pit excavation and the effect of different control measures are stud-ied.The research results indicate that foundation pit excavation will cause tunnel beneath and pit back-to-cov-er heave deformation.the tunnel heave reaches maximum value(4.88 mm)after the completion of back cover casting.The simulation result matches measured datam 4.9 mm.Under the reinforcement control measures' condition from simple to strictly,the tunnel and pit back cover of heave value shows the trend of descending. This indicates that the reinforcement control measures have a certain effect under various operating condi-tions,in which the effect of the reinforcement outside the pit and pit bottom loading on lower tunnel is obvi-ous;the steel support and the reinforcement of pit end reduce back cover heave obviously.
What problem does this paper attempt to address?