Challenges in structural design and execution: Stuttgart's new central station

Roland Bechmann,Angelika Schmid
DOI: https://doi.org/10.1002/suco.202300783
2024-05-04
Structural Concrete
Abstract:Stuttgart's main station is being completely revised and remodeled as part of the Stuttgart Ulm railway project. The old terminus station is being replaced by an underground through station. The chalice supports are a major design feature of the new platform hall. This article describes how they were designed.
construction & building technology,engineering, civil
What problem does this paper attempt to address?