BIM pilot project Granitztal tunnel chain – Development of data structures for tunnel structure and track superstructure

Christoph Exinger,R. Matt,Johann Lemmerer,Günther Mulitzer,E. Griesser,Rudolf Felsner
DOI: https://doi.org/10.1002/geot.201800022
2018-08-01
Geomechanics and Tunnelling
Abstract:An essential part of the Koralmbahn line, the Granitztal tunnel chain with a length of about 6.1 km runs between the Lavanttal and the Jauntal valleys and crosses the Deutsch Grutschen, the Granitztal and the Langer Berg. In early 2016, Austrian Railways ÖBB made a decision for the Granitztal tunnel chain project, which was then already under construction, to test the 3D model‐based Building Information Modelling (BIM) design method in addition to conventional 2D design. One essential precondition for the application of the BIM method on transport infrastructure projects was recognised as the required data structures. In addition to the definition of general project requirements and standards for BIM, work started on the structuring and classification of the construction elements required for the tunnel structure and their properties. Of equal importance are the spatial positioning and location of the construction elements and the definition of topological relationships to each other.
Engineering
What problem does this paper attempt to address?