Numerical Study of the Use of Tyre-Derived-Aggregate (TDA) as the Backfill Above Flexible PVC Pipeline

Barbara Kliszczewicz,Magdalena Kowalska,Barbara Kliszczewicz and Magdalena Kowalska
DOI: https://doi.org/10.1088/1757-899X/960/3/032044
2020-12-10
IOP Conference Series: Materials Science and Engineering
Abstract:Tyre Derived Aggregates (TDA), produced by shredding scrap car tyres, show many interesting features, such as: durability, low bulk density, thermal insulation, good drainage properties or ability to damp vibrations, which makes them a useful material for civil engineering. One of the possible applications is the partial filling of excavations with TDA during the construction of underground pipelines in order to decrease the load applied on the pipe. The article presents results of a multivariate numerical study of 2D FEM models of a flexible PVC pipe - soil system, in which the presence of a mixture of sand and TDA (tyre chips - 40% by weight) (STCh) in the backfill was simulated. The models differed in the thickness of the STCh layer ( t = 0 – 0.9 m) and inclination of the excavation walls (a trench with vertical walls or open excavations with 3:1 and 1:1 slopes). The main goal of the numerical analyses, performed by means of the Z_Soil.PC program, were to investigate the effect of the presence of the softer STCh layer in the backfill zone on the pipe deformation (relative deflection δ / D ) and internal forces in the pipe wall. The soil was simulated with the use of either the Hardening Soil Small (HSS) or Coulomb-Mohr (CM) constitutive model with the parameters' values estimated based on results of laboratory tests (published by researchers from Wollongong University). The PVC pipe was modelled as linear elastic. The results of the analyses show that, due to enhanced arching, STCh layer of the optimum thickness t = 0.55 m can effectively reduce δ / D when used in the backfill of the trench. It can also decrease the difference between the maximum and minimum bending moment in the pipe wall, leading to less ovalization of the pipe cross-section. This positive effect diminishes if the width of excavation is larger, as the model is gradually transforming towards the positive projecting conduit type. The CM model gives underestimated values of the pipe deformation and internal forces. Though, in the case of lack of all the HSS parameters' values, it is better to use the CM model with E = E 50 than E = E ur as it gives a better approximation of pipe behaviour.
What problem does this paper attempt to address?